Back to results

Swindon's Canal: Virtual Tour

  • Available anytime
  • Online event
  • Pre-booking not required

In this Google Earth "Virtual" tour we will follow along the lost canal route through Swindon's town centre and continue along a watered section at Kingshill, ending at the "Dragonfly" canal boat landing stage at Wichelstowe.

The "Wilts & Berks" canal construction started from Semington near Melksham in 1795 and finished at Abingdon in 1810.

Boats first arrived at Swindon's wharf in 1804, initially bring stone and bricks.

The "North Wilts" canal construction started from Swindon in 1814 and finished at Latton near Cricklade where it connected to the Thames & Severn canal, this connection brought in coal from the Forest of Dean.

The "Wilts & Berks" canal was prosperous until the railway came to Swindon in 1841, after which the canal declined and was formally abandoned in 1914.

To open the Google Earth virtual tour Click here

Timings & Tours

Available anytime

Booking information

Pre-booking requirement:
Pre-booking not required

Check out our online channels

Back to results