Back to results

Wilts & Berks Canal: Virtual Tour

  • Available anytime
  • | Online event
  • | Pre-booking not required
  • | Walk / Tour

Google Earth "Virtual" tours
- Swindon mainline canal from Wichelstowe to Marsh Farm bridge
- Swindon North Wilts canal from the town centre to Cheney Manor
- Pewsham canal site: three locks, dry dock, saw pit & carpenters workshop

The "Wilts & Berks" canal construction started from Semington near Melksham in 1795 and finished at Abingdon in 1810.

Boats first arrived at Swindon's wharf in 1804, initially bring stone and bricks.

The "North Wilts" canal construction started from Swindon in 1814 and finished at Latton near Cricklade where it connected to the Thames & Severn canal, this connection brought in coal from the Forest of Dean.

The "Wilts & Berks" canal was prosperous until the railway came to Swindon in 1841, after which the canal declined and was formally abandoned in 1914.

To open the Google Earth virtual tours:
Swindon Mainline Tour
Swindon North Wilts Branch Tour
Pewsham Tour



Timings

Available anytime

Booking information

Pre-booking requirement:
Pre-booking not required

Check out our online channels

Back to results